The work for the new chrome plating line continues with the delivery of essential parts:
- the structure that will support the tanks 70 cm from the ground. The elevation makes it possible to avoid pits and to benefit from a slope.
.jpg)
In total there will be around fifty tanks for the entire chrome plating process.
- the rail that will carry the overhead cranes to handle the loads
In addition, a red coating was laid to seal the floor.
.jpg)