REFERENCES

L'Académie - Montrouge,
L'Académie, Montrouge

For this project, several products have been selected. Among them, the Cut & Click universal washbasin waste.

Click on the picture for more information:

1249 bonde universelle

HÔPITAL DE L’INSTITUT CURIE À SAINT-CLOUD
Hospital of the Institut Curie, Saint Cloud

For this project, several products have been selected. Among them, this adjustable brass trap for washbasin.

Click on the picture for more information:

siphon laiton

IMM | Institut Mutualiste Montsouris Hôpital
Mutualist Institute Montsouris Hospital, Paris

For this project, several products have been selected. Among them, the double-hook stainless steel shower hose with rotating nut.

Click on the picture for more information:

flexible inox

Grand hôtel de Malo-les-Bains
Grand Hôtel, Malo-les-Bains

For this project, several products have been selected. Among them, the Minime extra-flat shower waste.

Click on the picture for more information:

bonde douche Minime

Immeuble FLOW - Montrouge
Flow building, Montrouge

Selection for this site of the free flow waste made of chrome-plated brass.

Click on the picture for more information:

bonde laiton

Armée de terre, Quartier des Loges, Saint Germain en Laye
Army, Loges Quarter, Saint Germain en Laye

Selection for this site of the TBXP, universal washbasin drain with extra-flat piping.

Click on the picture for more information:

Campus Deloitte - Marne-la-Valée
Deloitte Campus, Marne-la-Valée

Selection for this project of the design culbuto washbasin waste.

Click on the picture for more information:

Bonde culbuto lavabo 1206

Private bathroom renovation, Seb Le Plombier

Selection for this project of the Cleopatre bathtub, elegant and comfortable.

Reinforced with GreenAcryl, a healthy and environmentally friendly material.

Click on the picture for more information:

baignoire solo cleopatre

Melia Villa Marquis, Collection Hôtel, Paris
Melia Villa Marquis, Collection Hôtel, Paris

This 4-star hotel has undergone a total renovation. Located closed to Champs Elysées and Eiffel Tower, it offers bright and contemporary rooms and suites, a new generation fitness center and fully equipped meeting rooms.

Le SITI, Orléans
SITI, Orléans

Selection for this project of the Classic 2 shower column.

Click on the picture for more information:

combiné de douche Classic 2 5017

Hôtel de la Marine, Paris
Hôtel de la Marine, Paris

For this hotel, several products have been selected. Among them, the design and adjustable Cylindrix trap for washbasin.

Click on the picture for more information:

1300 Cylindrix siphon lavabo

Rue Marcadet - Paris
Rehabilitation of 469 apartments rue Marcadet, Paris

For this project, several products have been selected. Among them, the universal adjustable basin trap.

Click on the picture for more information:

6103 siphon lavabo universel

L'usine d'éolienne en mer - Le Havre
Sea wind turbine site, Le Havre

For this project, several products have been selected. Among them, the connectic trap for washbasin.

Click on the picture for more information:

siphon connectic 6107

Immeubles de bureaux V2/V3 Dock en Seine, Saint Ouen
Office buildings V2 & V3 Dock en Seine, Saint-Ouen

For this project, several products have been selected. Among them, the adjustable Cylindrix basin trap.

Click on the picture for more information:

Cylindrix bonde lavabo 1308

Sways restructuration et extension bâtiment - Issy-Les-Moulineaux
SWAYS, Issy-Les-Moulineaux

For this project, several products have been selected. Among them, the free-flow grid waste for washbasin, special for communities.

Click on the picture for more information:

Bonde grille lavabo collectivité 1201

Hôtel Astra Opéra - Paris
Hôtel Astra Opéra, Paris

For this project, several products have been selected. Among them, the washbasin overflow waste with digiclic valve.

Click on the picture for more information:

1231 bonde lavabo lanterne digiclic

Hexagone appartements et commerces - Bezannes
Hexagone building, Bezannes

Selection for this site of the Evolutive floor drain which allows without heavy work to convert a bathtub to a shower.

Click on the picture for more information:

5683 bonde évolutive PMR

L’archipel, futur siège de VINCI
L’archipel, future headquarter of VINCI, Nanterre

Project is in progress: 5 buildings, 74,000 m² of offices, 1,500 m² of shops and 4,000 workstations.

 La Flambée, restaurant aux Sables-d'Olonne
Restaurant La Flambée, Sables d’Olonne

Selection for this project of the brass trap Cylindrix.

Click on the picture for more information:

Nous utilisons des cookies pour améliorer notre site et votre expérience. En utilisant notre site, vous acceptez notre politique de cookies.